Tensegrity deployment

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
6,526
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Dec 30, 2008

Deployement of a two stage tensegrity Snelson tower, buildt with Lego and fishing rope.

La mia tesi di laurea sulle strutture tensegrity:
www.dariogenovese.com/tesi.pdf

Category:

Science & Technology

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (HellGauss)

  • I understand how to lay out the solid pipes, just how to string them together to make it all pop up at once. It appears to be strung throughout in the video, but in looking at your close up images it looks like maybe some of the connections are more static.

    Thanks for any help, I'm not trying to steal any ideas or creativity and I will give you credit in my class!

  • Each cable has two edge fixed at the solid pipes, except for the six middle strings, which are made with only one deployable cable.

  • do you have a diagram of some kind on where you connected the fishing line? I don't know spanish :(

  • @mulengro777

    On my thesis (link on the right)

    Download the pdf, pag 68 (fig 3.8), pag 72 (fig 3.9 and 3.10)

see all

All Comments (7)

Sign In or Sign Up now to post a comment!
  • Thanks a lot! while that does help a lot, I don't speak or read Italian :(

    Do you have any instructions in the way of

    "string from point a1-point a2, b1, c2"?

    If that makes sense...

  • also, sorry if it's not spanish! :D

  • awesome!

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more