Server Room Construction, Six Months in Two Minutes

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
6,623
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Dec 28, 2010

This video shows the installation of support equipment needed for the first twenty-five racks of servers. It begins after the raised floor is back in place. All of the ceiling and parts of the access floor was removed to allow footings to be poured for structural upgrades and refrigerant pipes to be run for rooftop condensers.

Timeline:

The Liebert XDC and XDH units are delivered.

Electrical work under the floor continues.

Refrigerant piping work continues above the ceiling. Connections are made to XDH units from the large distribution pipes above the ceiling grid. The pipes are insulated and covered.

The dark areas are when the light fixtures were being rewired.

The ceiling tiles are replaced. The area under the raised floor is cleaned in a dramatic shuffle.

The under-floor electrical "whips" are installed for the servers racks which later appear like magic.

Hundreds of pounds of refrigerant is added to the Liebert XD systems and they are started.

  • likes, 1 dislikes

Link to this comment:

Share to:
see all

All Comments (12)

Sign In or Sign Up now to post a comment!
Safety mode has hidden comments for this video. Show hidden comments
Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more