Sorry for the delay in responding, I have been on vacation.
The train cost $900 and the track work on this phase about $400. I have since added a waterfall and pond, brige and trestles, and I am working on the upper loop. I expect the finihes layout without plants to be about $2000. Size is 13 ft wide by 40 ft long.
can you make another vid that is a cool little layout just with the loop and 2 or 3 buildings i saw i think i saw more track with a trestle and stuff can you make a vid of that and where did you get that western style train from??
how much did this all together cost
killthemonkey4evr 3 years ago
Sorry for the delay in responding, I have been on vacation.
The train cost $900 and the track work on this phase about $400. I have since added a waterfall and pond, brige and trestles, and I am working on the upper loop. I expect the finihes layout without plants to be about $2000. Size is 13 ft wide by 40 ft long.
60steamer 3 years ago