Upload

Westside Subway Extension seismic reports discussion (Part 2 of 3)

Metro Los Angeles Metro Los Angeles·357 videos
937

Subscription preferences

Loading...

Loading icon Loading...

Working...
268 views
Like     Dislike 0

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like Metro Los Angeles's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike Metro Los Angeles's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add Metro Los Angeles's video to your playlist.

Uploaded on Oct 25, 2011

Part Two of Three: Los Angeles (Oct. 19, 2011) Members of the Metro Board Planning & Programming Committee discuss expert findings of three panels of nationally and internationally recognized seismologists, geologists and engineers with participants following oral presentation of the Tunnel Safety and Fault Investigation reports for the Westside Subway Extension. Part Three documents the news briefing following the conclusion of the Metro Board of Directors Planning & Programming Committee presentation and discussion.

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

The interactive transcript could not be loaded.

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
Sign in to add this to Watch Later