Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Installation of Pre-Finished Engineered Hardwood Flooring - Hurley NY

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
3,958
Google+
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Sep 7, 2010

Installation of pre-finished engineered hardwood flooring. The 1/2 inch hardwood flooring was installed by placing the tongue into the grove and using an 1 inch narrow crown floor stapler to secure the wood plank by stapling through the tongue through the plywood sub flooring.

Category:

News & Politics

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • Nice floor congras

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more