Helicopter stringing cable on Hughes Transmission Project

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,353
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 16, 2009

Here's a look at how the contractor for the Hughes Transmission line, Timber Line Construction, installed transmission lines north out of the Dry Fork Station switchyard. This part of the Tongue River section of the 230-kilovolt conductor goes over the top of rail spurs. They were able to pull five lines in less than two hours this morning.

Thanks to Bill Morgan, shift supervisor at Dry Fork Station, for the video!

www.basinelectric.com

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • Great footage!!!

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more