Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

SEPTA Post Blizzard - 16TH- ST Junction Frozen Over Va R6 Silverliner V

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
773 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jan 2, 2011

The SEPTA Reading Main Line's normally busy 16th St Junction where the R6 Norristown Line diverges from the 4-track trunk line on the day after the Boxing Day Blizzard of 2010. While Monday the 27th was clear and sunny, bitter cold and strong winds made clearing the snow a challenge and the field of double slip switches at 16TH ST were completely frozen over.

SEPTA was running a special snow plan that ran all R6 trains on a dedicated Track 4 which allowed the dispatchers to straight rail tracks 1,2 and 3 and only have to keep one normal turnout at 16TH ST available for service. The facing point turnout on the R6 tracks would be reversed to require only a single static route through the double slips.

Category:

Autos & Vehicles

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more