Senior design project developed a way to maximize energy efficiency of the boiler blowdown system. Modeled the entire boiler system in AutoCAD 3D and evaluated a full life cycle financial analysis of the building project. The design saved $256,000/yr with a 2 month payback.
Link to this comment:
All Comments (0)