Thursday, March 24, 2011
Construction Dynamics, RW Irvine & Sons and General AC & Heating provide plumbing, mechanical and sheetrock finishes to the Office and Bathroom Areas of the Storage building.
Construction Dynamics (Fitchburg) installed 5/8-inch drywall to the office, lounge and bathroom areas of the building. RW Irvine & Sons (Lynn) provided final plumbing and gas connections to the six (6) interior hose bibbs, gas fired furance and bathroom fixtures. General AC (Dorchester) installed supply and return air supply ductwork to the Bathroom , Lounge and Office Areas.
All Comments