Basement dig out and remodel

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,966
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jan 30, 2011

Remove over 20 inches of dirt to increase headroom in basement. Homeowner was very impressed at our efficiency and progress. Installed bathroom with sump system. We modified planned layout to eliminate obtrusive posts and allow for more open space. Proper insulation types and application in basements is critical and if not properly installed will cause mold.
Space to be heated with radiant floor heat in concrete slab.
" I choose ACS because they quoted one of the better prices and did the best job of showing thier ability to do the work. I was not disapointed. They were very easy and flexible to work with. They were expedient and proficient with a somewhat involved basement remodel including a complete new foundation and slab. Trust was never an issue. "

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more