Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

8h in first thinnings

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
577 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Dec 25, 2010

harvesting first thinnings on a logset 8h, 100-120 m3 a day is the target

Category:

Autos & Vehicles

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (MrJakefish)

  • Yer that's pretty good going.. I've done 1250m3 in 38 hours. That's my best but Its finding enough stuff like that in are area to do those volumes. Do you operate a harvester?

  • fair play 100 meters a day in pine ,must be a long day

  • @MrTimberslayer yerr i do a 12 shift just production hours.. try to get 10 meters an hour, this was the worst bit to be honest. good to only have one spec though, as cutting stakes ect would really slow you down. what machine do u operate?

see all

All Comments (6)

Sign In or Sign Up now to post a comment!
  • lol first thinnings are boring haha and dull does the logset have a auto fell button =]

  • soz forgot to mension it was most windblow an some standing

  • there is a harvester driver around where i live who did 3300 m3 in 10 days

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more