Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Automatik

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
392 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Feb 3, 2009

Line D
Line D commenced operation under human control on September 4, 1991 between Gorge-de-Loup and Grange-Blanche. The line was extended to Gare de Vénissieux on December 11, 1992, at which time it switched to automatic operation. Rubber-tyred trains run automatically with no driver on board, controlled by a system known as MAGGALY (Métro Automatique à Grand Gabarit de l'Agglomération Lyonnaise). On April 28, 1997, it was extended again to Gare de Vaise.
Being the deepest of the lines in Lyon, it was constructed mainly using boring machines and passes under both rivers, the Rhône and the Saône. At 13 km (8.08 mi) long, it is also the longest of the lines in Lyon.

Category:

Film & Animation

Tags:

License:

Standard YouTube License

  • likes, 2 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more