Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Data Center Move

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
118 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 21, 2011

Cisco Nexus 5000 and 2000 connected to a Nexus 1000v on 2 Dell 1000m chassis. Upgrade from 1 6509 to a second 6509 with VSS that connects to the Nexus 5000. We moved all production equipment over a weekend. We had everything back online in less than 48 hours. We transformed the worst cabling and cheapest cabinets I have ever encountered into a layout that is one of the cleanest cabling and cabinets that I have ever seen. It was a rare opportunity to move the all our production equipment at the same time. Most companies our size would not have taken such a big risk.

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • By moving and orginizing all equipments and clabing i bet 90% of your problems are gone, since they are mostly caused by problems in the physical layer right...lol

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more