YouTube home Comedy Week on YouTube
Upload

#5 Family Aquatic Complex Construction Update

cityofwindsor cityofwindsor·145 videos
122
130 views
Like     Dislike 0

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like cityofwindsor's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike cityofwindsor's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add cityofwindsor's video to your playlist.

Published on Sep 28, 2012

The first four containers holding the competitive pool for the Family Aquatic Complex have arrived at the construction site, 401 Pitt Street in Windsor.

Crews are unpacking, sorting and taking inventory of the containers in preparation for installation starting in late October. Currently the floor for the pool is being poured. The steel superstructure is being completed over the pool. All pool components will be sequenced to allow for efficient installation starting at the south end of the pool and moving to the north end.

Two other shipments each with approximately four containers will follow at staggered dates to allow for efficient installation. The other shipments will contain the wave pool, lazy river, play area pool, activity/ therapy and two slide pools.

For the latest updates, visit www.citywindsor.ca or "Like" us on facebook at www.facebook.com/CityOfWindsor.

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

The interactive transcript could not be loaded.

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

All Comments (0)

Sign in now to post a comment!
  • Loading comment...
Loading...
Loading...
Working...
Sign in to add this to Watch Later