Final walk-through of the kitchen and bathroom renovation. All of this was designed mostly by me, my wife and Kevin at Floorcraft. I did 90% of the work on the bathroom and assisted the vendors with the kitchen. This was started on Dec 29, 2009 and the final permit was signed off in October 2011.
Link to this comment:
All Comments (0)