Upload

Loading icon Loading...

This video is unavailable.

London Cycle Superhighway 8 (CS8) Updates

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like westcountrytim's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike westcountrytim's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add westcountrytim's video to your playlist.

Uploaded on Apr 17, 2011

London Cycle Superhighway 8 is partly built, so I took a look at the good and the bad points.

Battersea Park road still suffers from parking reducing the lane to one lane of traffic, meaning you will get stuck in stationary traffic at rush hour. Although there are sections where they have narrowed the central reservation and put in a separate cycle lane.

The turn off Chealsea bridge could be interesting in heavy traffic getting across to the right hand lane.

The Millbank section looks good with a wide (2m) lane, although I hope the mandatory lines will be enforced.

Overall it looks like it needs some improvements.

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to