Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

EXCALIBUR AIRCRAFT: TRIAL FITTING OF THE COMPONENTS

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
481 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Aug 20, 2009

I',m trial fitting the voltage regulator, the starter solenoid, and a new ground plate has been installed. The wire bundle is being built up. I made a bridge connector between the EGT probe connectors and the rest of the wire going up to the instrument panel since the probe connectors didn't have standard pins on them. I will also have to do the same for the CHT senders as they too have odd ball size pins on them.

Once I have made the bridge connectors I'll install regular aircraft connectors of the environmental type to complete the wire bundle assembly.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more