The FLUID CHANNEL collects the oil and gas plumb in a giant inverted funnel at the source. The plume grouped together rising by itself, becoming a free flowing stream of oil and gas when the whole plume is contained by this flexible membrane boundary such as a closed curtain of adequate cross section standing right up from the source to the surface. Volume to handle is limitless as it is always possible to design a sheath or sleeve large enough to allow free flow and expansion of gas going up without restriction. Total volume of oil and gas can thus be moved to the surface, free flowing, without the need of pumps or siphon of any kind. Once it has engaged within this continuous buoyant sheath for example 30 to 40 feet in circumference linking the forming plume over the BOP to the surface of the sea where the full flow can be contained within floating flexible tanks to be further loaded aboard tankers. To build this system it is estimated to take only 5 to 14 days. This has been submitted to BP Deepwater Horizons suggestion site and a an official Coast Guard White Paper
Go to www.gulfoilspillsolution.org for more info on this and other similar solutions. Email info@www.gulfoilspillsolution.org or contact Jeff Holden at Holden Development at jeff@holdenusa.com 866-509-8326 or contact the author Pierre Jutras at airsolid@colba.net Phone: 1 514 581 6412
Pierre Jutras Animation
I wonder if we all could work together in cleaning up this mess?
COAKD1 1 year ago