Industrial Construction - Manufacturing - Siemens

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
349 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon
Ratings have been disabled for this video.

Uploaded by on Oct 28, 2010

Gray will be aiming for LEED® Gold Certification with design that features an on-site wind turbine. Teqton, a joint-less, maintenance free floor slab will be installed in this facility -- making it the first of its kind in the U.S.

The complex manufacturing plant, about the size of 5 football fields, is a structure designed to carry heavy loads to allow the movement of nacelles throughout the building.

This plant's annual planned output will be approximately 650 nacelles or 1,500 megawatts per year. Nacelles are 90-ton oblong steel structures perched atop wind turbine towers that house generators, gears and electrical systems.

More information available at: http://www.gray.com/manufacturing-plant-construction/siemens-energy-inc

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more