Here is the first locomotive to run down the ATSF Line from the old Pinole section, and onto the new Franklin Canyon section. High/Low areas is due to track not being glued down yet. Engine stops on switch because of gaps cut in the rails. Once glues and wired correctly, it will work beautifully. :)
Link to this comment:
All Comments (0)