damn that sure is the hard way. i remember when we did the isa strip. it was a scraper, pushing a scraper, being pushed by a d10 at th hind side. that way the earth was getting scraped two deep level's and that's how much was needed to be scraped to make it flat really.
The key on that job as 2 y have 2 dozers is the shear volume of material to be moved and the amount of scrapers to be pushed, just have a count of how long it takes these guys to get a scraper in and out of the cut and check the loads in them even with those huge hungry boards, if someone in Australia had the wherewithall to do it that way you would here about it pretty quick on the grapevine who the new scraper dirt moving kings would be.
@Jizzem66 Bloody yanks, yeah what would they know about scraper push loading hey?
A scraper being pushed by a scraper being pushed by a dozer, riiiiiiiiiight.
Gavin84w 6 months ago
good team work,,
bobtul 1 year ago
20 second loading time is pretty good, dozers rattling back in third gear hard on undercarrige not so good
catskinner619 1 year ago
what happened to push pull scrapers?
wA7racer 1 year ago
@Gavin84w
damn that sure is the hard way. i remember when we did the isa strip. it was a scraper, pushing a scraper, being pushed by a d10 at th hind side. that way the earth was getting scraped two deep level's and that's how much was needed to be scraped to make it flat really.
Bloody yank's.
Jizzem66 2 years ago
Have you seen O & O costs for 11,s and also initial purchase prices? I have and i think i know what way i would go, infact it really is a no brainer.
Gavin84w 2 years ago
Cool Video...
aviceman 2 years ago
The key on that job as 2 y have 2 dozers is the shear volume of material to be moved and the amount of scrapers to be pushed, just have a count of how long it takes these guys to get a scraper in and out of the cut and check the loads in them even with those huge hungry boards, if someone in Australia had the wherewithall to do it that way you would here about it pretty quick on the grapevine who the new scraper dirt moving kings would be.
Gavin84w 2 years ago
this is way different to australia. im 25 and confused. why need two dozers to do one dozers job?
caldwell1983 2 years ago
What is needed here is a700hp(the real D10) or a 770 D11N or 850hp D11R.The D10 and D11s are built for pushing the larger 651 and 657s.
generationll 2 years ago