SUNY Fredonia Science Center walkthrough

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,262
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Sep 8, 2011

See more at: http://www.fredonia.edu/sciencecenter

The SUNY Fredonia Science Complex will be completed in two phases beginning with the construction of the new building followed by the renovation of Houghton Hall. The entire complex will be 101,000 net square feet (188,000 gross).

The new building, currently in design, is 57,415 net square feet (92,000 gross) and will cost $60M. We expect to break ground in the spring of 2011 with the target completion date of fall 2013.

The design for the renovation of Houghton will start in 2011 and construction is slated to commence upon the completion of the new building.

Currently, the Science, Technology, Engineering & Mathematics (STEM) programs at SUNY Fredonia are housed in 4 different buildings. This will change with the construction of our new Science Center and the renovation of Houghton Hall. These buildings will be connected to form a unified complex known as the Fredonia Science Complex.

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 3 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • FIRST!

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more