Eurolite LSD - LED Soft Display (curtain) - Assembly instructions

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
387 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Mar 23, 2011

Assembly instructions

- Please make sure the LEDs are on the inside when coiled up for the transport.
- It's important to attach the support bars properly: stick the bars through the belt's flap. Only in so doing, a safe grip can be guaranteed. A seamless connection of several curtains is thus alleviated, too.
- Fix the belts with the hooks' fastenings looking to the front
- Now, take the fastening back over the trussing and fasten the belts on the reverse side
- Connect the respective data signal inputs and outputs of the two curtains
- Press the push-buttons with your fingers and close them and fasten the hook-and-loop fastener
- Connect the signal outputs of the Eurolite LSD AIO box with the Eurolite LSD curtain
- Press the test mode key a bit longer, then the test mode starts. Now you can check whether the LSD works or the several parts have been connected properly
- The test mode performs a run of the RGB colors as well as a horizontal and vertical test line
- After a successful test you can start running your animations, texts, pictures and videos on the LSD curtains

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more