Baltimore Tunnel

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
250 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Mar 20, 2011

The Tunnel in Baltimore goes underneath the atlantic bay in Baltimore.

Since MdTA utilizes "pooled toll financing" on its 7 highway toll facilities, whereby the toll revenues from all of them are pooled to properly fund the construction and operation of the whole system, it is highly unlikely that the Harbor Tunnel Thruway and Key Bridge tolls will ever be removed. While it may or may not be "fair" to have tolls on the Fort McHenry Tunnel, given that its construction received 90% federal-aid Interstate funding, the city and state will do everything in their power to keep the tolls in place.

Fort McHenry Tunnel - Vital Facts
Length 1.7 miles
Highway class Freeway, built to Interstate highway standards
Highway route Interstate I-95
Water body crossed Baltimore Harbor and shipping channel
Total number of lanes 8 lanes
Number of tubes 4
Number of lanes per tube 2 lanes
Roadway width per tube 26 feet from curb to curb
Roadway vertical clearance 16 feet
Speed limit Variable up to 55 mph
Toll facilities Electronic tolling plus cash lanes, toll plaza in Canton
Toll $2 for 2-axle vehicle, commuter discounts available
Pavement type Asphalt (bituminous concrete)
Administrative agency for design, right-of-way and construction Interstate Division for Baltimore City (IDBC)
Owner since opening Maryland Transportation Authority (MdTA)
Design Prime Consultant Sverdrup & Parcel and Parsons, Quade, Brinckerhoff & Douglas (joint venture)
Initial estimate of cost total for design, right-of-way and construction $825 million
Contracting method Agency public bid contracting, 11 construction contracts
Construction Began May 7, 1980
Trench Tunnel Prime Contractor Kiewit/Raymond/Tidewater (K-R-T)
West Approach Prime Contractor Lane Construction Corporation
East Approach Prime Contractor S. J. Groves & Sons Co.
Mechanical and Electrical Prime Contractor Howard P. Foley Co.
Facility target date for completion Early 1985
Final cost total for design, right-of-way and construction $750 million
Funding method 100% Interstate highway federal-aid, with 10% to be repaid by state from toll revenue
Facility opened to traffic November 23, 1985
Traffic Volumes as of December 2005 Average about 118,000 vehicles per day, 9% large trucks

Category:

Travel & Events

Tags:

License:

Standard YouTube License

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • love going throgh that!

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more