Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Sound Installation: Argus Project, (First Walk)

Loading...

Sign in or sign up now!
239 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 8, 2008

This is another video of a presentation of the Argus Project, an environmental sound installation by Jonathon Kirk and Lee Weisert. This video was taken at an Oct. 4, 2008 presentation at Eastern Illinois University in Charleston, IL. Four speakers surround the pond emitting processed source sound coming from two underwater hydrophones (microphones) below the pond's surface. Two lasers from across either end of the pond track disturbances on the water's surface. The laser disturbances are converted into data and then used to further process the sound. The source sounds from the pond include, water currents, insects, frogs, turtles, surface disturbances and an occasional fish bumping into the microphones. The sound installation is only operational at night so that the solar cells are able to pick up the laser beam from a far distance. The sound processing was executed in the Max/MSP programming environment.

  • likes, 0 dislikes

Link to this comment:

Share to:

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more