Upload

Loading icon Loading...

This video is unavailable.

Post Construction Hydrotest Calculations in COMPRESS

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like CodewareInc's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike CodewareInc's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add CodewareInc's video to your playlist.

Uploaded on Apr 8, 2011

To obtain Code stamping, the ASME Code requires that all vessels be hydro (or pneumatic) tested following fabrication. In addition, user design specifications often require that new pressure vessels be designed for a future (post construction) hydro test in the fully corroded condition. This video shows how to calculate a post construction hydrotest using COMPRESS. For more infomation abut the COMPRESS hydrotest calculation please see http://www.codeware.com/compress/hydr... .

To find out more, contact Codeware:

(941) 927-2670
sales@codeware.com
http://www.codeware.com

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to