AEROPOSTAL DC9 TORTU MARGARITA (Rwy 09)

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
3,716
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on May 19, 2008

DC9-50 YV-10C VH306
CARACAS:PORLAMAR (00:33min)
CPT Eduardo ORTIZ F/O Diego MALRAUX

MISSED APCH:Climb 500',RIGHT to 1500'to MT LOM and Hold.

ILS Rwy 09
Final Apch Crs 091
GS LOM (1429')
ILS DA 274'
Apt Elev 74'

NORMAL PROCEDURES CHECKLIST:
--------------------------------------
DESCENT
Landing data Prepared
Pressurization Set and checked
Engine sync Off
Engine ignition Continuous
Engine/Airfoil anti-ice As required
Windshield anti-fog As required
Shoulder harness On
(18,000' MSL)
Exterior lights If required
Altimeters Reset and crosschecked
Rad-nav/DFGC switches RAD/as required
Hydraulic panel HI/ON/Checked
(10,000' MSL)
Sterile cockpit Chime

BEFORE LANDING
Altimeters Reset and crosschecked
Flt Instr and bugs Set and crosschecked
Seat belt/No smoking sign ON
Gear Down, 3 green
Spoiler lever Armed
Auto brakes As required
Flaps/slats ___/___/Land position
Annun lights Checked

LANDING
Spoiler lever Check full aft
Reverse levers As required

AFTER LANDING - TAXI
Autopilot and autothrottle Off
Landing lights Ret
Spoiler lever Ret
Auto brake Off/Disarm
Flaps/slats UP/RET and no lights
Radar Off
Transponder Standby
Anti-skid Off
Brake pressure Monitor
APU As required
Pneu x-feeds As required
Right engine (for 1 engine taxi) Shut down

Category:

Autos & Vehicles

Tags:

License:

Standard YouTube License

  • likes, 1 dislikes

All Comments

Adding comments has been disabled for this video.

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more