Union Light Pack Entering the " Spaghetti Loop "

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
187 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on May 5, 2009

Union RailRoad MP15DC's 30 and 24 are seen entering the spaghetti loop trackage, after working Kenny Yard, the units will head into the yard and decrew.

© Copyright West Keystone Videos™

Category:

Autos & Vehicles

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (3)

Sign In or Sign Up now to post a comment!
  • Hell, i think 24 is in safety now

  • Haha you got the prototype of my HO model on film! I'm still waiting to see #24 in person...

  • Yes, it is very much interesting! on the other side of the river is the CSX/URR Dexter Yard,and the CSX Main, on 1 bridge is the URR main, along with a single ramp leading down into the Edgar Plant. Then the parallel bridge is the NS Main, and the NS main meets the NS Mon Line here. Featured below me is the Union's biggest yard, the Classification Yard

  • Wow, look at that maze of tracks... looks almost like... spaghetti!! (sorry, couldn't resist that LoL). Liked the close shots of those little blue Union engines, and the little caboose... nice!!!

  • It is very much an akward track layout

  • That is a different but cool track layout. Nice video!

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more