95% complete. Bathroom taps to be installed. Glass balcony to be installed. Stair bannisters and steel to be painted white and acacia wood steps to be installed. Painting touch up. Roof terrace plastering. Extra tiling in shower area of bathroom and handles for kitchen and closets
Link to this comment:
All Comments (0)