The Blackhawk AR-10 (Pat. Pend.) has been installed for 5 months now at this location. The test cabinet shown has 2 deep-cycle marine batteries wired in series for 24V installed at its base. Two Xantrex C35's are used, one as a charge controller with a diversion load, and the second as a load controller to prevent over-discharge of the batteries. The load controller is capable of cycling the inverter off and on, but requires a relay due to the heavy start-up current of the inverter. Several minor upgrades such as chromoly wing support rods and teflon sleeving on the push-pull rods where they pass through the guides, have given us a very robust system we feel can run for several years without maintenance in the coldest and hottest environments.
www.BlackhawkWindEnergy.com
Thank you for the detailed explanation. Can you offer any advice for my wind project ?
derman077 1 year ago
@derman077: Drive faster?
BlackhawkWindEnergy 1 year ago