Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

DMJ DRAINAGE - WEST -- EAST LINK MAIN WATER PIPELINE

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
173 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Aug 16, 2011

http://www.dmjdrainage.co.uk - Tel. 01205 480958

WEST -- EAST LINK MAIN WATER PIPELINE

Pre-Construction and Post-Construction Land Drainage for the West-East Link Main Water Pipeline, connecting Merseyside and Greater Manchester.

Location: From Prescott Reservoir in Merseyside to Woodgate Hill Reservoir in Bury

Date: Completed 2011

Duration: 3 Year Contract

Equipment: Mastenbroek 30/20, Barth K171, 360ยบ Excavator, 4 x LD1000 Tracked Stone Carts, Mastenbroek CT12

Description: DMJ Drainage were assigned to carry out both the Pre-Construction and Post-Construction Phase of the 54km Water Pipeline that Murphy Pipeline Ltd completed on behalf of United Utilities. The Land Drainage works were completed to plan and within time and budget. Due to the scale of the project, the Land Drainage works were completed over a 3 Year period.

Category:

People & Blogs

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

All Comments

Adding comments has been disabled for this video.
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more