This video shows dredging for the cruise ship terminal in Falmouth, Jamaica taking place on 8th December 2009. The silt screens are not in place and there is a clearly visible plume of silt down-current (west) of the dredge. There is no plume visible to the east of the dredge, so the plume is clearly is a direct result of the dredging operation.
Link to this comment:
All Comments (0)