Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Dolton Industry Park, a busy day

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,770
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jan 12, 2012

2 arriving and 2 departing trains, one IHB train each way and one Chessie train each way, plus the various switching activities make this operating session very busy. All cars moved during the opearting session featured in this video were virtual interchange car moves. Video is on my Dolton Industry Park HO scale model railroad switching layout. Around 20 minutes long.

  • likes, 1 dislikes

Link to this comment:

Share to:

Uploader Comments (jimsmodeltrains)

  • How do you power your layout?

  • @adaribros I use a Roco Lokmaus 2 DCC system with 3 controllers (although I normally only ever use one).

see all

All Comments (8)

Sign In or Sign Up now to post a comment!
  • Nice layout. Thanks for sharing!

  • nice

    

  • That good nice operation

    quenneviller

  • Very nice! Lots of action. Thanks for posting this vid.

    Dan

  • Great video! I really like the 2 engines working together - thanks for making video, I will enjoy this many times.

  • Damn, that wore me out just trying to figure out what the next moves were to be! Great job.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more