BP OIL - NO BS !! - 2 WELLS DRILLED ABANDONED - 2 of 4

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,273
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 29, 2010

According to OFFICIAL MMS DOCUMENTS, BP planned to DRILL AND ABANDON 2 WELLS in the Macondo Prospect / MISSISSIPPI CANYON BLOCK 252. In this video the EXACT FOOT COORDINATES OF BOTH WELLS (Well A & Well B) are given along with a SURVEY MAP of the area showing the precise location of the proposed drill sites!!!!!!!

LINK TO MMS DOCUMENT:
http://www.gomr.mms.gov/PI/PDFImages/PLANS/29/29977.pdf

Also shown are the exact LIVE COORDINATES OF THE ROV SITTIING RIGHT ON TOP OF PROPOSED "WELL A" LOCATION!!!!!!!!

Category:

News & Politics

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (2)

Sign In or Sign Up now to post a comment!
  • Thre were at all 3 wells drilled: All three into Tiber oilfield ( discovered by BP itself) estimated to be one of the biggest offshore ressources ever discovered.

    One into about 12.000 meters below surface in 2009( deepest ever!) . Its was sealed with the purpose of " later exploration" - 1,which is the 1. macondo well, where ( Williams) the driller got stucked and had to be cut .Then DWH started to drill a new well B which is the one , where is assumend the incident happened.

  • i've watched the first two parts...very solid evidence.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more