Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Two Proven P11 6kW wind turbines on 9m towers in Cornwall

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
562 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Apr 24, 2011

Here is a short video of two Proven P11 6kW wind turbines on 9m towers on a comunity project.

These turbines are grid tied, the unit on the left is connected to the grid producing 5.5kW - 6kW and the unit on the right is under going a G83 test on the inverter, so not loaded.

This system was designed and supplied by Capture Energy Ltd, Redruth:

http://www.capture-energy.co.uk

Category:

Science & Technology

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (WindyJAMiller)

  • vawt much better less noise

  • @MrDuajuta cost more, less efficient, most have to motor up so consume some power, typically erected on fixed mono pole tower so harder and more expensive to service. But they are quieter, but why would you put a turbine where it could be heard?

see all

All Comments (3)

Sign In or Sign Up now to post a comment!
Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more