Here is a short video of two Proven P11 6kW wind turbines on 9m towers on a comunity project.
These turbines are grid tied, the unit on the left is connected to the grid producing 5.5kW - 6kW and the unit on the right is under going a G83 test on the inverter, so not loaded.
This system was designed and supplied by Capture Energy Ltd, Redruth:
http://www.capture-energy.co.uk
vawt much better less noise
MrDuajuta 1 week ago
@MrDuajuta cost more, less efficient, most have to motor up so consume some power, typically erected on fixed mono pole tower so harder and more expensive to service. But they are quieter, but why would you put a turbine where it could be heard?
WindyJAMiller 1 week ago