Water damage was caused by a broken supply line to toilet in bathroom, causing damage to 6 offices, hallway, 2 lab rooms, break room, and lobby. visit www.svma.com
Technicians assessed damage and determined that a large trailer dessicant would be ideal to dry structure with the least amount of structural damage. Technicians had to set up a spider box to support the amount of airmovers necessary for this dry down.
WIth the right amount of airmovers and dehumidification, the structure was able to be dried down in 3 days. The only repairs needed were small patch work to drywall, replacing of vinyl base, and cleaning of carpet.
This is a video showing set up of equipment on initial inspection.
Very impressive equipment...
TheFloorBoys 8 months ago
I don't think that many air movers are not needed in the hall way looks like over Kill to this IICRC Certified Technician
rgarciaarea51 1 year ago