Teekay Kristin Project for Statoil

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
248 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 27, 2011

The requirement was to maintain field production and export during unplanned export riser repairs at the Kristin oil field.

During a 2.5 month fast-track project, shuttle tankers, Navion Britannia and Navion Hispania, went through comprehensive preparations to meet all field specific and statutory requirements. We developed field specific DP software, installed a telemetry system, re-programmed the communication systems and developed specific training programs, field operation manuals and emergency procedures. This enabled us to deliver nine days of continuous loading operation on Dynamic Positioning (DP) through direct loading to the shuttle tanker until completion of export system repairs.

Category:

People & Blogs

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more