BIM Awards US 2010 - Nathan Wood, Sutter Medical Center

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
595 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Dec 8, 2010

Sutter Medical Center Castro Valley (SMCCV) is an innovative 130 bed replacement hospital
currently under construction. Completion is scheduled for in June of 2012. The estimated maximum price set for this project is $320 Million. The seven story building is a composite steel and concrete framed structure. The structural design of this building is considerably more complex due to the new seismic requirements set forth in California's legislation. This fast track project is scheduled to be delivered 30% faster than comparable healthcare projects in California. This schedule would not be possible without the use of BIM technologies and the innovative 11-party lntegrated Project Delivery (IPD) team. This team has been working together since 2008 to build a completely coordinated and constructible model that will eventually get passed onto the owner for facilities management use.

Additional Companies:
Air System, Inc.; C/S Erectors, Inc; Capital Engineering Consulting; Clark Pacific; Devenney Group Ltd.; Ghafari Associates, LLC; Gregory P. Luth and Associates; Harris Salinas Rebar Inc.; J.W. McClenahan Co.; Morrow- Meadows Corporation; Royal Glass Company, Inc.; Strategic Project Solutions; Superior Air Handling; The Herrick Corporation; Tmad Tayor & Gaines; Transbay Fire Protection, Inc.; The Engineering Enterprise; Sutter Health

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more