NYAR RS60 & 61 On The Mainline In Full Throttle With Push Pull Operations.

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
277 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 20, 2011

We start out In Mineola around 10:15am. The RS60 makes it's way east through Mineola. Normally the 60 crew Operates from Pinaire (Deer Park/Brentwood) and out east on the Greenport Branch. Strangely enough, They were covering the duties of the RS40 crew.. Moving along.. The second clip is the RS61 returning from the mainline duties seen here in Bethpage heading west to Fresh Pond Yard (Queens) around 3:15pm. This train is not equipped with Train line MU Cables. The lead engine and trailing engine are working separately to power the train. Rather Interesting operation to say the least.. Enjoy.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (6)

Sign In or Sign Up now to post a comment!
  • yeah

  • Really good horns too

  • Extremely

  • Helll yeah

  • Last clip takes me back to seeing those things shoving on a P72 at the end of a passenger consist... good shit!

  • Insert "This shit safe?"

  • Loading comment...
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more