The Network Rail 'New Measurement Train', lead by 43062 and tailed by 43014, arrives in York having run up the ECML from London on its way to Edinburgh
Three techies, lots of computers/monitoring equipment (similar to a mobile laboratory), a conference room (or two possibly?), diesel generator-sets (for a stable ETS supply),
Yeh, track-quality, ride-stability, track-geometry, OLE-positioning, you name it and they'll check it! :P
89001avocet 3 years ago
basicly fuck load of eq to messure track and speed
djmadboy2 3 years ago
Three techies, lots of computers/monitoring equipment (similar to a mobile laboratory), a conference room (or two possibly?), diesel generator-sets (for a stable ETS supply),
89001avocet 3 years ago
what do they fill thoes trains up with?
Boristhe3rd 3 years ago