This is a 3-slot manifold I designed and had fabricated in 2008-2009. Very compact (12 ft x 12 ft x 10 ft tall) and is estimated at 22 tons. This manifold sits on a suction pile in 4953 ft water depth and ties the Rockefeller well into the Hoover platform, via the Madison flowline. This state-of-the-art, compliant designed manifold is the newest addition to the Company's fleet of subsea kit.
Link to this comment:
All Comments (0)