Dies ist ein Teil aus einer Serie von Videos, die verschiedene Stadien des Linientausches der Linien U2 und U3 der Hamburger U-Bahn am Berliner Tor zeigen. Aufgenommen jeweils am Verkehrshistorischen Tag des angegebenen Jahres.
In diesem Video:
neue Streckenführung der U3 zwischen HB und BT. Die Tunneldecke ist noch geöffnet.
This video is part of a series showing different stages of a major modification of the Hamburg subway network which took place between 2006 and 2010: the eastern branch of the U3 between Berliner Tor and Mümmelmannsberg became the eastern branch of the U2, while the former U2 branch between Berliner Tor and Wandsbek-Gartenstadt became a part of the U3. The branch exchange required the two lines also exchanged their tracks at Berliner Tor station. As the track and tunnel layout west of Berliner Tor station was fairly unflexible (every train would have to cross the other line's tracks before calling at Berliner Tor), large parts of the tunnel had to be modified.
In this video:
new track layout of the U3 between Hauptbahnhof Süd and Berliner Tor. The tunnel is still opened.
@rct800 Meinst du die Unterführung ab 0:25?Das war von vorm Krieg,als es noch die Rothenburgsorter Linie gab-HBF Süd war viergleisig,die Rothenburgsorter Gleise lagen in der mitte,wurden später überbaut.Die jetztigen waren die Äusseren,die Ringgleise.
Und an dieser Stelle hier wurden die Rothenburgsorter unterfahren,weil die nach rechts abzweigten.Du siehst links den leeren Gleistrog,ab der Unterführung schwenkten sie darüber nach rechts.Der Tunnel existiert noch,wird als Aktenkeller genutzt.
ColonelHogan9162 1 year ago
warum wird immer kurz vorm bahnsteig erst alles in farbe davor schwarz weiß?
Ruelley 1 year ago
Weiß jemand, was das am Hbf Süd werden sollte?
rct800 1 year ago