Clem7 Tunnel Drive - Opening Night (16/03/10)
Loading...
2,813
Loading...
Uploader Comments (tonzislandsandman)
see all
All Comments (5)
-
@tonzislandsandman im surprised this aint 2-4 lanes each way, thats the same problem here, theyre planning to widen the M5 east tunnels to 4 lanes in each way
-
i wonder what the fate of this road is for the investors which put money into it because it doesnt look very healthy at the moment... more traffic needs to pass through it every day for it be worth the investment it cost rivercity
-
it is only 4.8 km in length
-
Because of this POS tunnel traffic at lutwyche road is horrendus especially in peak hour. well done brisbane transport people
Loading...
Wynnum road after shafston av on the south side is now beyond a congested joke during peak hour.
tonzislandsandman 1 year ago