The nuclear power plant at Cernavodă in Romania. There are five reactors, some of them are still under construction. I have checked the radiation background with my dosimeter - it was normal (0,08 - 0,12 μSv/h).
Hey im MrFlaviuboy @ new account and no, i`m not living there but i went there many times, and about CANDU vs PWR?
The only advandage is that our country can do lots of heavy water so in our case the CANDU(pressurized heavy water reactor) is better and more flexible than PWR(pressurized water reactor).
natural background reading...and nothing 'happened' there. The unfinished units you see to the left are units 3-5 that were never finished. (unit 5 was never meant to be built from the get-go)
valoarea de 0.10 microsilveri indicata de aparatul respectiv este neinsemnata.,..eu lucrez in centrala iar doza incasata zilnic este mult mai mare.,.fara sa ma ingrijoreze.,.din cauza oamenilor cu rele intentii se amana si inceperea lucrarilor la unitatile 3 si 4.,.eu as zice sa va ganditi la partile bune ale centralei.,.daca unit 3 si 4 s-ar incepe.,.am avea cu totii de castigat.,.noi ca oameni.,.orasul asta si chiar saraca noastra Romania.,.pace
It is a nuclear power plant which has already 2 running reactors, another 2 reactors are in construction and will be finished around 2015, the entire facility is situated in Romania, in a city named Cernavoda
You should go closer to test the radiations ! :D
darkdjo 2 months ago
lucreaza 2 din 5 ?
TheHaiduk81 3 months ago
@hans1066
Hey im MrFlaviuboy @ new account and no, i`m not living there but i went there many times, and about CANDU vs PWR?
The only advandage is that our country can do lots of heavy water so in our case the CANDU(pressurized heavy water reactor) is better and more flexible than PWR(pressurized water reactor).
stixhns 4 months ago
@MrFlaviuboy
u living there? I think the CANDU is technically better and more flexible than PWR...what you think?
hans1066 5 months ago
natural background reading...and nothing 'happened' there. The unfinished units you see to the left are units 3-5 that were never finished. (unit 5 was never meant to be built from the get-go)
jerem525 7 months ago
@reichstag10 cum poti sa zici ca la capacitate mica? @ reactoare produc cate 700MW fiecare. Ti se pare putin?
cortexedge 7 months ago
valoarea de 0.10 microsilveri indicata de aparatul respectiv este neinsemnata.,..eu lucrez in centrala iar doza incasata zilnic este mult mai mare.,.fara sa ma ingrijoreze.,.din cauza oamenilor cu rele intentii se amana si inceperea lucrarilor la unitatile 3 si 4.,.eu as zice sa va ganditi la partile bune ale centralei.,.daca unit 3 si 4 s-ar incepe.,.am avea cu totii de castigat.,.noi ca oameni.,.orasul asta si chiar saraca noastra Romania.,.pace
stizo1989 8 months ago
@gigiboxa inca nu este terminata....da functioneaza doua reactoare..cand o sa fie gata o sa poata duce aproape o jumate de Romania...
cafta 1 year ago
@thejoshinator08
It is a nuclear power plant which has already 2 running reactors, another 2 reactors are in construction and will be finished around 2015, the entire facility is situated in Romania, in a city named Cernavoda
MrFlaviuboy 1 year ago
@gigiboxa din cate stiu, mai functioneaza, si inca la capacitate mica si este in curs de dezvoltare.
reichstag10 1 year ago