Simple, Flexible Installation and Cable Connections Key to Telects Load Center Panel

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,026
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Apr 27, 2010

This brief video focuses on the connection of input and output cabling, as well as the installation of fuses and/or circuit breakers in Telects high-current load center panel, an ideal platform for managing power to routers and servers.

See how a double-lug design in the rear of the panel enables the use of higher-voltage cables, helping to maximize the usage of the panel and minimize voltage drop if the load center is a great distance from the power feed.

Other installation tips include:
• Connection of double-pole circuit breakers through the use of a load strap;
• Simple wire connection of GMT fuse outputs;
• Installation of various distribution components, including single-pole and double-pole circuit breakers, TPC fuses and TPS/TLS fuses.

Learn more at Telect.com.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more