SPPC4807 Day 06 Modifying a wood connector, drawknobs (stops) connected to 'stop trees', supports for facade pipes installed, pipe racks on wind chests, top of 'stop trees' connected to the sliders on the side of the wind chest, completed mounting of the 32' Posaune (big wood reed pipes), moving large shinny facade pipe to balcony and install.
All Comments