Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Settle to Carlisle Railway Track Replacement: Track Panel Unloading at Ribblehead, UK 20090720

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
15,357
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 25, 2009

Network Rail workers unload a batch of track panels removed from the Settle to Carlisle railway line during track replacement work on 20/07/2009. The panels are being unloaded at Ribblehead station. The unloading procedure requires co-ordinated movements from the two road-rail cranes, synchronised by the use of the horn.
My Panasonic Lumix LZ2 camera is not the best for movies but good enough to show how the unloading work is done. It is quicker with teamwork from two smaller machines with custom attachments than it would be with a single larger crane. It is easier to control both ends of each panel and the machines fit more easily within the loading gauge. The two trolleys are on the uphill side of the far crane for safety.

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (4)

Sign In or Sign Up now to post a comment!
  • ive never seen this at warrington bank quay

  • ahh nice to see the boys in action that komatsu is a scrapper but me on the wx170 anyday

  • so this was the reason i couldnt get a "round robin" from the toon in the summer

  • good video mate 5*

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more