The Doe River Gorge volunteer track rehabilitators negotiatied the rough but barely serviceable track up to the first Doe River steel through-truss bridge. We can now transport our tools and supplies to this point!
Interesting. O saw this from the other end in 1980 and I remember tracks stll looking solid across both bridges and tunnels, like the last train had justrun the previous summer. I have been to the gorge twice since 2000, but I have never gottenup this far. Thanks for posting this, I've always wondered what this end looks like today.
hmmm.... It seems Len and I was going THE OTHER WAY!!..lol..(toward blevins)...hmmmm....river closer? Sure seems to make BRIDGE LOWER to the water......
It goes thru another tunnel then ends on other bridge......other bridge is little lower than this one......grade goes downward. We are insearch of vol. to help re-lay crossties to get train to bridge.
Interesting. O saw this from the other end in 1980 and I remember tracks stll looking solid across both bridges and tunnels, like the last train had justrun the previous summer. I have been to the gorge twice since 2000, but I have never gottenup this far. Thanks for posting this, I've always wondered what this end looks like today.
Willysmb44 1 year ago
Are trains able to get to the bridge, and if not what's a rough estimate on when they will be able to?
Punninator1 1 year ago
@railrider52
Track was pulled off and back from 2nd bridge when last owners had it...
piled-up around curve from 75' cut....
railrider52 1 year ago
@Conrail6370 track ends as starts on 2nd bridge.....rlrdr
railrider52 1 year ago
hmmm.... It seems Len and I was going THE OTHER WAY!!..lol..(toward blevins)...hmmmm....river closer? Sure seems to make BRIDGE LOWER to the water......
railrider52 1 year ago
@railrider52 The bridge is not lower. The river is closer. Its all up hill to the state line.
etwncengineer 1 year ago
Contact our roadmaster on utube acct. etwncengineer .....thanks...
railrider52 1 year ago
railrider52, do you people have a web address? I can post an add on our project's website.
I'm the Co-Volunteer Lead for DL&W 565 Restore project at Steamtown N. H. S. in Scranton, PA.
Len.
Conrail6370 1 year ago
great job Mike......
railrider52 1 year ago
It goes thru another tunnel then ends on other bridge......other bridge is little lower than this one......grade goes downward. We are insearch of vol. to help re-lay crossties to get train to bridge.
railrider52 1 year ago