After while lories are parked away from cycling line, which has been resurfaced recently. To prevent lorries parking on the cycling line four bollards been installed. However, twice some lorry rammed in to the bollard.
As result of the heavy lorry rolling over pavement, bollard has been knocked down and destroyed - cracked pavement concrete slabs.
Reported on www.fillthathole.org.ukas hazard no 14181
****
http://www.fillthathole.org.uk/hazard/14181/images
*****
I like the tree right in the middle of the road. They don't care about bikes. They just care about sticking "we now have 10 miles of cycle lanes" in their annual reports.
Dashdecent 2 years ago