Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Hindhead Tunnel

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
477 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 28, 2011

27th July 2011. The Hindhead Tunnel is a road tunnel that opened (southbound only) on 27th July 2011, four days ahead of schedule, as part of the new Hindhead bypass for the A3 road in Surrey. The northbound tunnel will open on 29th July. It forms part of the 4-mile dual-carriageway being built to replace the last remaining stretch of single-carriageway on the 68-mile London to Portsmouth road. The bypass is intended to improve road safety, reduce congestion and improve air quality. At 1.14 miles long, the tunnel is the longest non-estuarial road tunnel in the United Kingdom, and takes the road beneath the Devil's Punch Bowl, a Site of Special Scientific Interest.

Category:

News & Politics

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more